If you are installing a 9.
Proper framing for a garage door.
Header requirement 2 at minimum the header should be 12 wide with doubled 2 4 at opening and ceiling running the width of the door with a 2 4 in the center of the opening for the center bracket to attach to.
One stud for every linear foot.
Measure your door carefully and cut the opening to fit using a reciprocating saw.
The size of the garage door framing should equal the size of the door after the jamb is applied.
Use these rules of thumb to check the materials list.
If the door is 7.
Headers should be a minimum of 12 wide.
Frame the rough opening to 3 inches wider than the garage door size you have selected.
This will leave plenty extra for trimmers corners blocks and cripples.
Double trimmers should be used for garage door headers considering the length and the weight they bear.
You ll need the.
How to measure the finished width and height use of 2x4s for the sides and header.
Getting the opening ready.
How to frame a garage doors opening in this case 9ft wide by 8ft tall.
How should i prepare my garage door frame.
Cut the header from 2 x 12 lumber and to a.
You do this with a string line run along the top plate out from the edge of the plate about 1 2.
Make the opening the width of the door plus 2 inches 5 1 cm and if additional studs are needed a space for these as.
Measure the distance from the bottom plate of the wall to a point that is 1 1 2 inches higher that the garage door.
As you place each garage wall framing structure into position you want to first make sure it is in a straight line before you secure your bracing.
How to frame a garage door 1.
To finish the opening.
Frame the rough opening for the garage door to 3 inches wider than the garage door you have selected.
Let s get started with your framing 1.
Therefore before determining a rough opening for the garage door you need to decide upon the jamb material you ll use.
Frame the rough opening to a height that is 1 5 taller than the door that you have selected.
Total number of linear feet plus 20 percent.
For a new construction project you have to get the opening ready and make sure that the size of the opening matches the size of the door.
See our pdf for all the information.